Amandi Energy Limited
Ghana
Energy Projects
Gas Turbines / Combined Cycle
2016
In progress
The scope of the project includes the engineering, procurement, construction and commissioning of a 192MW combined cycle power plant in Takoradi. The plant will be implemented with the capability to operate on both natural gas and light crude oil, and will utilize the latest advanced version of General Electric’s well proven 9E gas turbine.
The project will be executed by METKA in consortium with General Electric.
The new CCGT station of 826MW, is one of the largest natural gas fired powered combined cycle (Combined Cycle Gas Turbine – CCGT) power stations in Europe, is currently under construction within the Ag.